What a lighting calculation delivers
Programs such as DIALux evo or Relux calculate a 3D model of the room using real luminaire data (manufacturers' luminous intensity distributions) and surface reflectances. The result is reliable values instead of estimates:
- Maintained average illuminance Ēm per assessment area
- Uniformity U₀
- Glare rating (UGR) and illumination of walls and ceiling, as required by EN 12464-1 [1]
- Number of luminaires, connected load and energy demand
The maintenance factor – the most common source of error
Standards specify maintained values: the average illuminance must never fall below the required level, regardless of the age and soiling of the installation. A higher initial value is therefore installed. The rule is: maintained value = maintenance factor × initial value [2]. If the maintenance factor is set too optimistically, the installation falls below the standard after a few years; if it is set too pessimistically, energy and investment are wasted.
The designer must state the maintenance factor, list all the assumptions behind it and draw up a maintenance schedule with intervals for cleaning and replacement [5]. Typical assumptions are 0.67 for clean rooms with a three-year maintenance interval and up to 0.8 for LED luminaires with annual cleaning [5].
Typical errors a calculation reveals
- Luminaire grid does not match the furniture layout, workstations lie in shadow
- Glare at screen workstations caused by unsuitable luminaires
- Walls and ceilings too dark – rooms feel gloomy despite sufficient desk illuminance
- Underestimated mounting heights in halls and atria
- Missing control and daylight zones
Relation to the HOAI
The German HOAI fee scale generally divides services into nine work stages, from establishing the basis (LP1) to project support (LP9) [3]. Basic services are those generally required for the proper fulfilment of a commission [4].
In the German fee scale HOAI, lighting installations belong to the service profile Technical Equipment, system group 4 high-voltage installations [6]. The object list assigns low-voltage installations including lighting installations, as well as outdoor lighting installations, to fee zone II, and lighting installations with special design requirements – for example lighting simulations using elaborate methods for museums or special rooms – to fee zone III [7].
| Work stage | Contribution of lighting design |
|---|---|
| LP1–2 Basis, preliminary design | Requirements, lighting concept, first rough calculation |
| LP3 Design | Complete lighting calculation, visualisation, cost calculation |
| LP5 Detailed design | Luminaire layouts, details, controls |
| LP6–7 Tendering | Manufacturer-neutral specification, checking alternative offers by recalculation |
| LP8 Site supervision | Acceptance, verification measurement if required |
Visualisation as a decision aid
False-colour images show where light is missing; photorealistic renderings show clients and users the effect. Design decisions are made before anything is ordered and installed.
What a verifiable lighting calculation includes
- Room geometry, furnishings and surface reflectances
- Evaluation areas with position, height and grid size
- Luminaire data with luminous intensity distribution (EULUMDAT/LDT or IES) and power ratings
- Maintenance factor with all assumptions and the associated maintenance schedule
- Results: Ēm, U₀, UGR, cylindrical illuminance, wall and ceiling values, energy demand
Frequently asked questions
Can I do the calculation myself with free software?
The programs are freely available, but the results depend on correct luminaire data, reflectances, maintenance factors and assessment areas. Proof of compliance requires expertise.
Do you also check alternative offers?
Yes. We recalculate proposed substitute luminaires so that "equivalent" is also equivalent in photometric terms.
What documents do you need for a calculation?
Floor plans and sections (DWG, DXF or PDF), details of the use and – if already chosen – the photometric data of the luminaires in EULUMDAT (LDT) or IES format.
Sources (in German)
- Baunormenlexikon – DIN EN 12464-1:2021-11
- licht.de – Lichtlexikon: Wartungswert
- HOAI.de – Leistungsphasen
- HOAI § 3 (gesetze-im-internet.de)
- licht.de – Wartung und Wartungsfaktor
- HOAI § 53 (gesetze-im-internet.de)
- HOAI.de – Anlage 15, Objektliste Technische Ausrüstung
Author: Paul Rostand Ndjeundoun, M.Sc. (Hons), Certified Lighting Expert (LiTG), Registered European Lighting Expert · As of November 2026. Standard values have been carefully researched but do not replace consulting the currently valid edition of the standard.